Dux Leaf Guard (250 Pit) - R209

Model: R209

  • Dux Leaf Guard (250 Pit) - R209

Installation Instructions:

  • Excavate hole for pit to required depth
  • Bed Pit on a sand base to set top of pit at installed level
  • Mark and cut pipe holes as required
  • Install pit in hole
  • Connect pipes
  • Seal pipe and pit with silicone
  • When installing a riser , ensure riser is secured to pit with supplied nuts and bolts, with supplied nuts and bolts, with a washer on each side of the assembly. Seal around Riser and Pit base with silicone.
  • Install grate – leave grate installed whilst back-filling and concreting.
  • Evenly backfill around pit
  • Support pits and riser

Tags: Dux, Leaf Guard,
Plumbing Plus © 2024